Guys, sorry for not updating this thread for a very long time. Problem is that the car is still not ready.
Tinkering and mechanical's are now complete and the car has come back to the painter. Some pictures from the tinkering work in progress:



After tinkering, It has spent numerous days at the hands of the mechanic and complete underparts work has been carried out. The following are the list of spares that are changed:
Suspension Bush kit
Link 4
Distance tube 2
Spacer 4
Lower arm high bolt 2
Torrison bar pin 2
Lower arm pin
Lower arm bush nova type
Upper link bush nova type
Wheel oil seal 4
Wheel bearing two sets
Brake Drum - 4
Brake mass cyl 4
Brake hose 3
Brake lining 2 sets
Wheel cylinder 4
Grease .5 kg
Gel grease .5kg
Brake oil
U clamp
Spring pad
Spring pin
Rear axle bearing
Shock absorber 4
Joint star - 3
Joint bed bearing
Steering box
Rack pinion
Ball joint
Tie rod end kit
Damper pad kit
Ball joint boot
The above set me back by approx 16k. That's not the end, there are some more which I will be getting by this month end:
Timing belt
Timing bearing 3
Fan belt and bearing
Castrol 20-40 Diesel Engine oil
Oil filter
Diesel filter
Air filter
Gearbox oil
Crown oil
and clutch related parts. Will know them only when the clutch is removed. I have decieded to bring up the car in perfect condition without any compromises and so the delay and cost are eventually evident.
Finally, the car was started after almost a year and made its way back to the painter last week.
Painted four different shades of green, one shade per door and finally zeroed in on one shade. The painter has started off with the job. Will update more details in due course. Few pictures of the selected color:
The finalized shade is on the FR door:



|